Claude Sonnet 5 on “A digest of several sources”: with Minto, better on quality and worse on structure
Structure 6 → 5 of 8 −1 Quality 8 → 9 of 10 +1
The judge on the output with Minto
Its surface pyramid is strong, but Lisbon is placed under settled facts and several dependencies are fabricated.
| Structure | Without Minto 6 | With Minto 5 | Change |
|---|---|---|---|
| Top | 1 | 1 | |
| Key-line composition | 2 | 2 | |
| Levels | 1 | 0 | −1 |
| Order and kind | 2 | 2 |
| Quality | Without Minto 8 | With Minto 9 | Change |
|---|---|---|---|
| Top | 1 | 1 | |
| Same-kind grouping | 2 | 2 | |
| Explainable order | 2 | 2 | |
| MECE | 1 | 2 | +1 |
| Visible, proportionate structure | 2 | 2 |
Outputs and the judge’s words are quoted as written, in English.
Without Minto
control prompt · blind labelout-04invented_facts- quality after the rubric’s penalty 7/10
The settled/ours/theirs split is strong, but unsupported review-scheduling claims weaken an otherwise useful digest.
Bottom line: The compliance track has one thing Fernway can unblock today — send the architecture diagram (drafted since Aug 11, per R-14) — and everything else is stuck waiting on Aldergate, with no dates attached.
Already answered / settled:
- A security review is mandatory before production; whether a pen test is also required will be decided by the reviewer, during that review — not settled yet.
- Dependency approval isn't a fixed process: it's assessed as part of the security review, case by case, no standard turnaround.
- Ireland-based staff are explicitly fine. (Lisbon-based staff were mentioned in the 9 July sync and Aldergate gave no response — unresolved, not "answered.")
- A hardening framework/OSS policy exists in principle, but doesn't remove the need for the review.
Blocked on Fernway (action ours):
- Data storage/encryption/logging requirements (gate review Q7) — Aldergate declined to answer until they see an architecture diagram. Draft has existed since Aug 11 but hasn't been sent. This is the one lever we control — send it before the next sync.
Blocked on Aldergate (no committed date):
- Approved-package list — promised 12 May by Mercer, promised again 9 July by Whitcombe, still not received (98 days open per R-11).
- Scheduling of the actual security review (and its pen-test decision) — no date set.
- Lisbon staff location — never addressed after being raised 9 July.
- S. Okafor (named information security owner) has never joined a call; Whitcombe has been relaying everything second-hand — worth asking to get Okafor directly involved to unstick the package-list and review scheduling.
Net effect on pricing: Build-phase price stays unfixed (R-07) until the review happens and the package list arrives — neither has a date.
With Minto
prompt with the skill · blind labelout-09invented_facts- quality after the rubric’s penalty 7/10
Its surface pyramid is strong, but Lisbon is placed under settled facts and several dependencies are fabricated.
The compliance track is stuck on Aldergate's side, not Fernway's — but you can unblock the biggest piece today by sending the architecture diagram, which has been sitting drafted since 11 August.
Settled, no action needed: a security review is mandatory before production (whether it includes a pen test is the reviewer's call, decided during the review itself); Aldergate's internal hardening framework doesn't replace that review; Lisbon is fine for Fernway staff to work from, same as Ireland — raised at the 9 July sync and never objected to.
Blocking Fernway, ready to clear today: the draft architecture diagram (gate-review.xlsx Q7, sync-0709.md) has existed since 11 August but hasn't been sent — send it now, since it's the one item entirely in Fernway's hands and it unlocks the storage/encryption/logging answer as well as dependency review, which also runs through the same security review (Q4).
Blocking Aldergate, chase today: the approved-package list has been promised twice with no delivery — 12 May by Mercer, 9 July by Whitcombe again "shortly," no date either time — and it's now open 98 days per the risk register (R-11); push for a firm date, ideally direct from S. Okafor, Aldergate's information security owner, who was named on 9 July but has never joined a call — Whitcombe has only been relaying to them. Dependency turnaround time is explicitly case-by-case, so don't wait on a timeline commitment there — go straight to the review.
Net effect on pricing: R-07 (build-phase price unconfirmed) stays open until the review happens, which itself is now gated on your diagram going out and Okafor engaging on the package list.
How the test was built
Claude Sonnet 5 received the same task twice. The control prompt is one framing line and the task. The prompt with Minto is the same task preceded by the full text of the skill. The judge read both outputs among 16 under blind labels and did not know which one had the skill.
Prompt without Minto 3 667 B
You are working on a business document using the Minto Pyramid Principle.
<!-- Original fixture. The scenario, company, people, systems and numbers are
invented for this benchmark. The defect pattern it tests — a digest of several
read sources delivered answer-first into chat — is modeled on real usage. -->
# Fixture 09: sources digest
**Mode:** `digest`
**Language:** `en`
## Context
You are assisting the tech lead of Fernway Systems, a vendor building a customer
support assistant for Aldergate Bank. Before Fernway can price the build phase, the
bank's compliance office must confirm its security requirements. You have just read
the three sources below in full. The tech lead has not read them and will not; they
are deciding what to do about the compliance track today.
## Before
Source 1 — `gate-review.xlsx`, sheet "Security questions", filled in by Aldergate's
compliance office on 12 May:
```text
Q1 Is a security review required before production?
A: Yes. A review is mandatory; whether a penetration test is also needed is
decided during the review itself, by the assigned reviewer.
Q2 Is there a security standard or checklist we can build against?
A: An internal hardening framework exists; a review is still required
regardless of conformance.
Q3 What is the policy on open-source dependencies?
A: A policy exists. The approved-package list will be sent to Fernway.
Owner: D. Mercer. Date: 12 May.
Q4 Must critical dependencies be approved individually?
A: Dependency usage is assessed during the security review.
Q5 What is the turnaround time for dependency approval?
A: There is no standard turnaround; it is case by case.
Q6 Can Fernway staff work from outside the UK?
A: Work from Ireland is acceptable. (No other country is mentioned.)
Q7 Where may customer data be stored, and with what encryption and logging?
A: Declined — "cannot be answered without an architecture diagram and a
design walkthrough". Encryption and logging requirements exist but are
not applicable outside an architectural context.
```
Source 2 — follow-up note from the 9 July delivery sync, `sync-0709.md`:
```text
Attendees: R. Whitcombe (Aldergate, delivery), tech lead (Fernway), PM (Fernway).
- Whitcombe repeated that the approved-package list "is being prepared" and will
reach Fernway "shortly". Action on Whitcombe, no date attached.
- Compliance contact named for the first time: S. Okafor, information security
owner. Okafor has not attended any joint meeting so far; Whitcombe passes
questions along.
- Agreed: Fernway sends the draft architecture diagram before the next sync so
the storage and encryption questions can get a real answer.
- Fernway's PM noted two Fernway engineers are based in Lisbon. Nobody from
Aldergate responded to the remark in the meeting.
```
Source 3 — Fernway's internal risk register, rows touching compliance, as of
18 August:
```text
R-07 Security requirements unconfirmed; build-phase price cannot be fixed.
Owner: tech lead. Status: open since 3 May.
R-11 Approved-package list not received. First promised 12 May (Mercer, per
gate review), promised again 9 July (Whitcombe). Status: open, 98 days.
R-14 Architecture diagram not yet sent to Aldergate; blocks the data-storage
answer (gate review Q7). Draft exists since 11 August. Status: open.
```
## Task
Give the tech lead a digest of these three sources in chat: what is already
answered on the compliance track, and what still has to be obtained from
Aldergate. The tech lead will act on it today.
Return only the result, with no explanation of how you produced it.
Prompt with Minto five parts, in order · 31 240 B
Below is a skill written as an instruction. Read it in full and apply it to the task at the end.===== SKILL.md =====SKILL.md at f4813ce 17 235 B===== references/rules.md =====references/rules.md at f4813ce 6 464 B===== references/templates.md =====references/templates.md at f4813ce 3 742 B===== TASK =====the whole case inputReturn only the result, with no explanation of how you produced it.
Case input before.md
<!-- Original fixture. The scenario, company, people, systems and numbers are
invented for this benchmark. The defect pattern it tests — a digest of several
read sources delivered answer-first into chat — is modeled on real usage. -->
Fixture 09: sources digest
Mode: digest
Language: en
Context
You are assisting the tech lead of Fernway Systems, a vendor building a customer
support assistant for Aldergate Bank. Before Fernway can price the build phase, the
bank's compliance office must confirm its security requirements. You have just read
the three sources below in full. The tech lead has not read them and will not; they
are deciding what to do about the compliance track today.
Before
Source 1 — gate-review.xlsx, sheet "Security questions", filled in by Aldergate's
compliance office on 12 May:
Q1 Is a security review required before production?
A: Yes. A review is mandatory; whether a penetration test is also needed is
decided during the review itself, by the assigned reviewer.
Q2 Is there a security standard or checklist we can build against?
A: An internal hardening framework exists; a review is still required
regardless of conformance.
Q3 What is the policy on open-source dependencies?
A: A policy exists. The approved-package list will be sent to Fernway.
Owner: D. Mercer. Date: 12 May.
Q4 Must critical dependencies be approved individually?
A: Dependency usage is assessed during the security review.
Q5 What is the turnaround time for dependency approval?
A: There is no standard turnaround; it is case by case.
Q6 Can Fernway staff work from outside the UK?
A: Work from Ireland is acceptable. (No other country is mentioned.)
Q7 Where may customer data be stored, and with what encryption and logging?
A: Declined — "cannot be answered without an architecture diagram and a
design walkthrough". Encryption and logging requirements exist but are
not applicable outside an architectural context.
Source 2 — follow-up note from the 9 July delivery sync, sync-0709.md:
Attendees: R. Whitcombe (Aldergate, delivery), tech lead (Fernway), PM (Fernway).
- Whitcombe repeated that the approved-package list "is being prepared" and will
reach Fernway "shortly". Action on Whitcombe, no date attached.
- Compliance contact named for the first time: S. Okafor, information security
owner. Okafor has not attended any joint meeting so far; Whitcombe passes
questions along.
- Agreed: Fernway sends the draft architecture diagram before the next sync so
the storage and encryption questions can get a real answer.
- Fernway's PM noted two Fernway engineers are based in Lisbon. Nobody from
Aldergate responded to the remark in the meeting.
Source 3 — Fernway's internal risk register, rows touching compliance, as of
18 August:
R-07 Security requirements unconfirmed; build-phase price cannot be fixed.
Owner: tech lead. Status: open since 3 May.
R-11 Approved-package list not received. First promised 12 May (Mercer, per
gate review), promised again 9 July (Whitcombe). Status: open, 98 days.
R-14 Architecture diagram not yet sent to Aldergate; blocks the data-storage
answer (gate review Q7). Draft exists since 11 August. Status: open.
Task
Give the tech lead a digest of these three sources in chat: what is already
answered on the compliance track, and what still has to be obtained from
Aldergate. The tech lead will act on it today.
The judge’s gold gold.md
Gold 09: sources digest
Original gold for an invented scenario.
Expected structure
Top: an answer to the tech lead's question, not a description of the sources.
The strongest available top is an action with its ground: the blocking questions
cannot be answered by more reading — send the architecture diagram (drafted and
sitting unsent since 11 August) and escalate the approved-package list as an
obligation now 98 days old. A top that merely states "five of seven questions are
answered" is weaker but acceptable if the two actions lead the groups.
Three same-kind groups the material supports, in any defensible order:
- Settled — do not re-ask. Review is mandatory (pen test decided during it);
a hardening framework exists but exempts nothing; dependencies are assessed in
the review with no standard turnaround; Ireland is cleared for remote work. - Blocked on Fernway's own move. The storage/encryption/logging answer (Q7)
was declined pending an architecture diagram; the draft has existed since
11 August and has not been sent (R-14). This is Fernway's blocker, not
Aldergate's. - Owed by Aldergate and overdue. The approved-package list, first promised
12 May by Mercer per the gate review — not 9 July by Whitcombe, so 98 days
overdue, which makes the ask an escalation of an old commitment rather than a
reminder. Direct access to Okafor, who has never attended and is reachable
only through Whitcombe.
Cross-source synthesis the digest must make
- The package-list promise appears in two sources with two dates; the digest
must date it from 12 May (the older commitment), not 9 July. - Q7's "declined" plus R-14's "draft exists since 11 August" must combine into
"the ball is in Fernway's court"; either fact alone misses the point. - The Lisbon remark: Q6 clears Ireland only. Two engineers in Lisbon are an
unanswered exposure, not a settled fact. Presenting Lisbon as approved is an
invention; omitting it entirely loses the one new risk the sources surface.
Presentation
Chat prose for one reader: answer first, grouped support, a reference to which
source each load-bearing claim comes from (sheet, note, or register row —
exact citation format is free). No marker legend, no mermaid diagram, no
findings table, no meta-commentary about how the groups are ordered. Headings or
bold group labels are acceptable; a full document apparatus (SCQ labels as
headings, scoring, appendix) is excessive. Length: roughly one chat screen —
condensing the six settled answers into one or two lines each is proportional
omission, not source loss.
Judge gpt-5.6-sol, effort high · Claude Sonnet 5, effort low · skill from commit f4813ce · run v1.7.0-final